Super User

Super User

Thursday, 12 May 2016 15:00

Progetto 330 500L Serbia

  • LINEA AUTOTELAIO COMPLETO
  • LINEA SCOCCA
  • LINEA FIANCATA DESTRA E SINISTRA
  • LINEA GANCI CHASSIS 1-2-3-4-5
Thursday, 12 May 2016 15:00

Project 520 Jeep Pernambuco

  • COMPLETE UNDERCARRIAGE LINE
  • BODY LINE
  • RIGHT AND LEFT SIDES LINE
  • HOOKS LINE CHASSIS 1-2-3-4
  • PROTOTYPE LINE
Thursday, 12 May 2016 15:00

Project Levante SUV Maserati Mirafiori

  • WATER TEST LINE 9 POSITIONS
Thursday, 12 May 2016 15:00

Project 952 Nuova Giulia Cassino

  • AUC LINE
  • COMPLETE WELDED BODY LINE
  • PAI LINE
  • WATER TEST LINE 9 POSITIONS
  • TTS LINE CHASSIS 1-2
  • TTS LINE CHASSIS 3-4
  • DECKING LINE (MECHANICS BODY MARRIAGE)
Thursday, 12 May 2016 15:00

Project Energy Saving

  • COOLING SYSTEM ON FIAT POWER TRAIN WORKS (TERMOLI AND FOGGIA).
Thursday, 12 May 2016 15:00

Project RFI Nuova Galleria Beverate (LC)

  • LIGHTING/EMERGENCY SUPERVISION AND MANAGEMENT IN CASE OF FAILURE INSIDE THE GALLERY
Thursday, 12 May 2016 15:00

Project Mackma Pipe Bending Machine

  • DEVELOPMENT, DESIGN AND REALIZATION OF PIPE BENDING MACHINES WITH SINGLE AND MULTIPLE BEND, NUMERIC CONTROL BASED
  • WELDED BODY LINE
  • SIDES LINE
  • FLOOR LINE
  • TTS LINE CHASSIS 1-2
  • PROTOTYPE LINE
  • TRANSPORT FOR WHEEL ALIGNMENT LINE
  • SUPERVISION ON ROLL BRAKE TEST STAND LINE
Tuesday, 10 May 2016 13:59

Image 7

Tuesday, 10 May 2016 13:59

Image 6

Page 5 of 6